News

Reconstruction of the railway

In the port of Klaipeda, JSC Malkų Įlankos Terminalas was the first to sign the “Bilateral agreement on infrastructure/superstructure improvements or development at the Klaipeda State Seaport” with the State enterprise Klaipeda State Seaport Authority. Under this contract JSC Malkų Įlankos Terminalas will invest in the construction of a new cargo terminal, while the Port Authority will reconstruct the railways on the leased territory of the terminal and build new roads.
The contract of the Port Authority was awarded to UAB Plunges Jonis along with Hidrostatybos Projektai. After reconstruction, terminal will be able to accept up to 40 rail wagons in to each of the 4 branches. 

Other news

MĮT
We have modernized our grain drying system
IMG_5423
Our employees have received prestigious awards
Apva logotipas
Implementing a project to reduce ambient air pollution
0-02-05-dd2c98e966e78b538db8da2304f76418382d6583c1b5cd87443cd31a6af388d3_cd6ce09432a7c96c_1
We've loaded a record amount of wheat
default
First half of 2025 - cargo volumes grow
1 2 3 4 5 6 7 8 9 10 11 12 13 14